Community Planning

Community Planning

The Community Planning program provides funding and planning assistance to applicants for implementation and planning projects that benefit the community and the regional transit system. Eligible implementation projects include zoning code updates, developer discussion panels, pedestrian access improvement plans and other innovative implementation approaches. Eligible planning projects include transit-oriented development (TOD) plans, and corridor, subregional or local access improvement plans.

Municipalities, counties, townships, councils of government / municipal associations, groups of two or more municipalities, and the RTA Service Boards (Chicago Transit Authority, Metra and Pace) located within the RTA's six-county service region (Cook, DuPage, Kane, Lake, McHenry and Will Counties) are eligible to apply to the Community Planning Program.

Through this program, the RTA seeks projects that are consistent with the Regional Transit Strategic Plan. For more information, visit the program website Community Planning.

To view the TOD study locations on a map, see the TOD Viewer.

Projects by Status

{"queryState":{"size":3,"from":0,"q":"","facets":{},"filters":[]},"step":3,"source":{"backend":"csv","url":"/sites/default/files/CPProjects_by_Status.csv"},"model":{"backend":"csv","url":"/sites/default/files/CPProjects_by_Status.csv"},"fields":[{"name":"Status","value":"Status","selected":false},{"name":"Number of Projects","value":"Number of Projects","selected":true}],"yDataTypes":[{"name":"Number","value":"Number","selected":false},{"name":"String","value":"String","selected":false},{"name":"Date","value":"Date","selected":false},{"name":"Auto","value":"Auto","selected":true}],"xfields":[{"name":"Status","value":"Status","selected":true},{"name":"Number of Projects","value":"Number of Projects","selected":false}],"xDataTypes":[{"name":"Number","value":"Number","selected":false},{"name":"String","value":"String","selected":false},{"name":"Date","value":"Date","selected":false},{"name":"Auto","value":"Auto","selected":true}],"seriesFields":["Number of Projects"],"yDataType":"Auto","xfield":"Status","xDataType":"Auto","graphTypes":[{"value":"discreteBarChart","selected":false},{"value":"multiBarChart","selected":false},{"value":"multiBarHorizontalChart","selected":false},{"value":"stackedAreaChart","selected":false},{"value":"pieChart","selected":true},{"value":"lineChart","selected":false},{"value":"lineWithFocusChart","selected":false},{"value":"scatterChart","selected":false},{"value":"linePlusBarChart","selected":false}],"graphType":"pieChart","width":640,"group":false,"options":{"showLabels":true,"labelType":"percent","tooltips":true,"margin":{"top":0,"right":0,"bottom":0,"left":0},"xAxis":{"rotateLabels":0,"axisLabel":"","axisLabelDistance":0},"yAxis":{"axisLabel":"","axisLabelDistance":0},"y1Axis":{"axisLabelDistance":0},"y2Axis":{"axisLabelDistance":0},"showControls":false,"showLegend":true,"reduceXTicks":false,"donut":true,"color":["#0065bd","#f9461c","#2d6245",""]},"computeXLabels":true,"sortFields":[{"name":"default","label":"Default","selected":false},{"name":"Status","value":"Status","selected":false},{"name":"Number of Projects","value":"Number of Projects","selected":false}],"errors":{},"chartHeight":"","xFormat":{"type":"String","format":""},"yFormat":{"type":"String","format":""},"y1Format":{},"y2Format":{},"sort":"","showTitle":false,"xValues":["",""],"xValuesFrom":"","xValuesTo":"","xValuesStep":1,"yValues":["",""],"yValuesFrom":"","yValuesTo":"","yValuesStep":1,"y1Values":[null,null],"y1ValuesStep":1,"y2Values":[null,null],"y2ValuesStep":1,"goal":{"value":"","color":"","outside":false,"label":false}}

StatusNumber of Projects
Completed191
In Progress4
Programmed18
Total213

Funding Totals by Source

{"queryState":{"size":100,"from":0,"q":"","facets":{},"filters":[]},"step":3,"source":{"backend":"csv","url":"/sites/default/files/CPFunding_Totals_by_Source.csv"},"model":{"backend":"csv","url":"/sites/default/files/CPFunding_Totals_by_Source.csv"},"fields":[{"name":"Funding Source","value":"Funding Source","selected":false},{"name":"Total","value":"Total","selected":true}],"yDataTypes":[{"name":"Number","value":"Number","selected":true},{"name":"String","value":"String","selected":false},{"name":"Date","value":"Date","selected":false},{"name":"Auto","value":"Auto","selected":false}],"xfields":[{"name":"Funding Source","value":"Funding Source","selected":true},{"name":"Total","value":"Total","selected":false}],"xDataTypes":[{"name":"Number","value":"Number","selected":false},{"name":"String","value":"String","selected":false},{"name":"Date","value":"Date","selected":false},{"name":"Auto","value":"Auto","selected":true}],"seriesFields":["Total"],"yDataType":"Number","xfield":"Funding Source","xDataType":"Auto","graphTypes":[{"value":"discreteBarChart","selected":false},{"value":"multiBarChart","selected":false},{"value":"multiBarHorizontalChart","selected":false},{"value":"stackedAreaChart","selected":false},{"value":"pieChart","selected":true},{"value":"lineChart","selected":false},{"value":"lineWithFocusChart","selected":false},{"value":"scatterChart","selected":false},{"value":"linePlusBarChart","selected":false}],"graphType":"pieChart","width":640,"group":false,"options":{"showLabels":true,"labelType":"percent","tooltips":true,"margin":{"top":0,"right":0,"bottom":0,"left":0},"xAxis":{"rotateLabels":0,"axisLabel":"","axisLabelDistance":0},"yAxis":{"axisLabel":"","axisLabelDistance":0},"y1Axis":{"axisLabelDistance":0},"y2Axis":{"axisLabelDistance":0},"showControls":false,"showLegend":true,"reduceXTicks":false,"donut":true,"color":["#0065bd","#f9461c","#2d6245"]},"computeXLabels":true,"sortFields":[{"name":"default","label":"Default","selected":false},{"name":"Funding Source","value":"Funding Source","selected":false},{"name":"Total","value":"Total","selected":false}],"errors":{},"chartHeight":"","xFormat":{"type":"String","format":""},"yFormat":{"type":"String","format":""},"y1Format":{},"y2Format":{},"sort":"","showTitle":false,"xValues":["",""],"xValuesFrom":"","xValuesTo":"","xValuesStep":1,"yValues":["",""],"yValuesFrom":"","yValuesTo":"","yValuesStep":1,"y1Values":[null,null],"y1ValuesStep":1,"y2Values":[null,null],"y2ValuesStep":1,"goal":{"value":"","color":"","outside":false,"label":false}}

Funding SourceTotalPercent
RTA$10,679,45647.2%
Local$5,005,29822.1%
CMAQ$6,960,55130.7%
Total$22,645,305100%

Project Details

YearProject TitleProject Type(s)GranteeRTALocalFederalTotalStatus
2020Calumet Park TOD Developer Discussion PanelDeveloper PanelVillage of Calumet Park$3,500.00 $0.00 $0.00 $3,500.00 Programmed
2020Chicago High Priority Commercial Corridors PlanCorridor PlanningCity of Chicago$114,000.00 $6,000.00 $0.00 $120,000.00 Programmed
2020DuPage County Mobility PlanTransit Improvement PlanDuPage County$80,000.00 $20,000.00 $0.00 $100,000.00 Programmed
2020Elburn TOD PlanTransit-Oriented Development PlanVillage of Elburn$106,250.00 $18,750.00 $0.00 $125,000.00 Programmed
2020Hanover Park TOD Zoning Code UpdateTOD Zoning Code UpdateVillage of Hanover Park$35,000.00 $0.00 $0.00 $35,000.00 Programmed
2020Harvey TOD Plan UpdateDeveloper Panel, TOD Plan UpdateCity of Harvey$26,589.00 $2,500.00 $145,447.00 $174,536.00 Programmed
2020Milwaukee Ave. Developer PanelDeveloper PanelCity of Chicago 45th Ward$3,500.00 $0.00 $0.00 $3,500.00 Programmed
2020North Branch Area Bus Network Enhancements PlanTransit Improvement PlanChicago Transit Authority$150,000.00 $150,000.00 $0.00 $300,000.00 Programmed
2020University Park TOD Plan UpdateTOD Plan UpdateVillage of University Park$26,590.00 $2,500.00 $145,448.00 $174,538.00 Programmed
2019Cary TOD PlanTransit-Oriented Development PlanVillage of Cary$10,000.00 $25,000.00 $90,000.00 $125,000.00 Programmed
2019Chicago 31st Street Little Village Corridor StudyCorridor PlanningCity of Chicago$64,000.00 $16,000.00 $0.00 $80,000.00 Programmed
2019Crystal Lake TOD Planning StudyTransit-Oriented Development PlanCity of Crystal Lake$120,000.00 $30,000.00 $0.00 $150,000.00 Programmed
2019Elevated Chicago Garfield Green Line South Action PlanTransit-Oriented Development PlanElevated Chicago$80,000.00 $20,000.00 $0.00 $100,000.00 In Progress
2019Itasca Downtown Strategic Action Plan UpdateTransit-Oriented Development PlanVillage of Itasca$80,000.00 $20,000.00 $0.00 $100,000.00 Programmed
2019Metra Station Optimization AnalysisTransit Improvement PlanMetra$52,000.00 $13,000.00 $0.00 $65,000.00 Programmed
2019Pace I-294 Tri-State Transit Market and Facilities AssessmentTransit Improvement PlanPace$0.00 $50,000.00 $200,000.00 $250,000.00 Programmed
2019Park Forest, Matteson and Richton Park Transportation Alternatives StudyPedestrian Access to TransitVillage of Park Forest$1,000.00 $0.00 $0.00 $1,000.00 Programmed
2019Riverside TOD Zoning Code UpdateTOD Zoning Code UpdateVillage of Riverside$35,000.00 $0.00 $0.00 $35,000.00 Programmed
2018Bartlett TOD Zoning UpdateTOD Zoning Code UpdateVillage of Bartlett$18,875.23 $0.00 $0.00 $18,875.23 Completed
2018Brookfield Developer Discussion PanelDeveloper PanelVillage of Brookfield$3,000.00 $0.00 $0.00 $3,000.00 Completed
2018Chicago - South Shore Corridor StudyCorridor PlanningCity of Chicago$28,729.00 $7,302.00 $110,000.00 $146,031.00 In Progress
2018Cicero Zoning Code UpdateTOD Zoning Code UpdateTown of Cicero$90,000.00 $10,000.00 $0.00 $100,000.00 Programmed
2018Maywood TOD Plan UpdateTransit-Oriented Development PlanVillage of Maywood$11,762.00 $3,250.00 $50,000.00 $65,012.00 In Progress
2018North Central Service Analysis and Implementation StudyTransit Improvement PlanVillage of Mundelein$50,000.00 $25,000.00 $50,000.00 $125,000.00 Completed
2018Robbins TOD Plan UpdateTransit-Oriented Development PlanVillage of Robbins$25,000.00 $0.00 $0.00 $25,000.00 In Progress
2018Winthrop Harbor Developer Discussion PanelDeveloper PanelVillage of Winthrop Harbor$3,000.00 $0.00 $0.00 $3,000.00 Completed
2016Chicago - Jefferson Park Station Area Master PlanTransit-Oriented Development PlanCity of Chicago$20,000.00 $25,000.00 $80,000.00 $125,000.00 Completed
2016CTA Bus Corridor Slow Zone Improvement InitiativesCorridor PlanningCTA$254,876.00 $63,719.00 $0.00 $318,595.00 Completed
2016Des Plaines TOD Developer Discussion PanelDeveloper PanelCity of Des Plaines$3,000.00 $0.00 $0.00 $3,000.00 Completed
2016DuPage Last Mile Transit Planning StudyTransit Improvement PlanDuPage County Division of Transportation$0.00 $0.00 $0.00 $0.00 Completed
2016Morton Grove Developer Discussion PanelDeveloper PanelVillage of Morton Grove$3,000.00 $0.00 $0.00 $3,000.00 Completed
2016Morton Grove TOD Zoning UpdateTOD Zoning Code UpdateVillage of Morton Grove$25,000.00 $0.00 $0.00 $25,000.00 Completed
2016Olympia Fields TOD Zoning UpdateTOD Zoning Code UpdateVillage of Olympia Fields$25,000.00 $0.00 $0.00 $25,000.00 Completed
2016Pace Central Harlem Avenue Corridor StudyCorridor PlanningPace$0.00 $39,900.00 $159,600.00 $199,500.00 Completed
2015Aurora Pedestrian Access to Transit Improvement PlanPedestrian Access to TransitCity of Aurora$0.00 $0.00 $0.00 $0.00 Completed
2015Aurora Station Boulevard Transit Plan UpdateTransit Improvement PlanCity of Aurora$0.00 $0.00 $0.00 $0.00 Completed
2015Bartlett Downtown / TOD PlanTransit-Oriented Development PlanVillage of Bartlett$0.00 $24,984.92 $99,939.67 $124,924.59 Completed
2015Brookfield TOD Zoning UpdateTOD Zoning Code UpdateVillage of Brookfield$4,000.00 $0.00 $16,000.00 $20,000.00 Completed
2015Evanston TOD Parking Regulations UpdateTOD Zoning Code UpdateCity of Evanston$5,000.00 $0.00 $20,000.00 $25,000.00 Completed
2015Forest Park TOD Zoning Code Update (Roosevelt & Harlem)TOD Zoning Code UpdateVillage of Forest Park$4,000.00 $0.00 $16,000.00 $20,000.00 Completed
2015Highwood TOD Zoning UpdateTOD Zoning Code UpdateCity of Highwood$4,000.00 $0.00 $16,000.00 $20,000.00 Completed
2015Libertyville TOD PlanTransit-Oriented Development PlanVillage of Libertyville$80,000.00 $20,000.00 $0.00 $100,000.00 Completed
2015Mount Prospect Rand Road Corridor PlanTransit Improvement PlanVillage of Mount Prospect$100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2015Pace Local Transit Planning For Hoffman Estates, Waukegan and WoodridgeTransit Improvement PlanPace Suburban Bus$0.00 $30,000.00 $120,000.00 $150,000.00 Completed
2015Pace North Avenue Corridor StudyCorridor PlanningPace Suburban Bus$0.00 $40,000.00 $160,000.00 $200,000.00 Completed
2015Palatine TOD PlanTransit-Oriented Development PlanVillage of Palatine$79,994.00 $19,999.00 $0.00 $99,993.00 Completed
2015River Grove Developer Discussion PanelDeveloper PanelVillage of River Grove$3,000.00 $0.00 $0.00 $3,000.00 Completed
2015Skokie Developer Discussion PanelDeveloper PanelVillage of Skokie$3,000.00 $0.00 $0.00 $3,000.00 Completed
2015West Chicago Developer Discussion PanelDeveloper PanelCity of West Chicago$3,000.00 $0.00 $0.00 $3,000.00 Completed
2015Worth TOD PlanTransit-Oriented Development PlanVillage of Worth$19,954.67 $14,966.00 $39,909.33 $74,830.00 Completed
2014Bellwood Developer Discussion PanelDeveloper PanelVillage of Bellwood$3,000.00 $0.00 $0.00 $3,000.00 Completed
2014Forest Park Developer Discussion PanelDeveloper PanelVillage of Forest Park$3,000.00 $0.00 $0.00 $3,000.00 Completed
2014Fox Lake Developer Discussion PanelDeveloper PanelVillage of Fox Lake$3,000.00 $0.00 $0.00 $3,000.00 Completed
2014Geneva TOD Zoning UpdateTOD Zoning Code UpdateCity of Geneva$4,000.00 $0.00 $16,000.00 $20,000.00 Completed
2014Kane County Ride-in-Kane AssessmentTransit Improvement PlanKane County DOT$15,000.00 $60,000.00 $75,000.00 Completed
2014Lemont Developer Discussion PanelDeveloper PanelVillage of Lemont$3,000.00 $0.00 $0.00 $3,000.00 Completed
2014Melrose Park Broadway Avenue Corridor PlanCorridor PlanningVillage of Melrose Park$19,999.60 $79,998.40 $99,998.00 Completed
2014Park Forest TOD Pedestrian Access PlanPedestrian Access to TransitVillage of Park Forest$0.00 $0.00 $0.00 $0.00 Completed
2014Tinley Park Developer / Financial Advisory PanelDeveloper PanelVillage of Tinley Park$3,000.00 $0.00 $0.00 $3,000.00 Completed
2013Blue Island Developer Discussion PanelDeveloper PanelCity of Blue Island$3,750.00 $0.00 $0.00 $3,750.00 Completed
2013City of Chicago Ashland-Western Bus Rapid Transit Land Use Development PlanTransit-Oriented Development Plan, Transit Improvement PlanCity of Chicago$160,000.00 $40,000.00 $0.00 $200,000.00 Completed
2013City of Chicago Metra Station Area Typology StudyTransit-Oriented Development PlanCity of Chicago$100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2013Franklin Park Zoning Code UpdateTOD Zoning Code UpdateVillage of Franklin Park$4,334.00 $0.00 $17,332.00 $21,666.00 Completed
2013Hanover Park Developer Discussion PanelDeveloper PanelVillage of Hanover Park$3,750.00 $0.00 $0.00 $3,750.00 Completed
2013Highwood Transit-Oriented Development PlanTransit-Oriented Development PlanCity of Highwood$100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2013New Lenox Developer Discussion PanelDeveloper PanelVillage of New Lenox$3,750.00 $0.00 $0.00 $3,750.00 Completed
2013Northbrook TOD Zoning Code UpdateTOD Zoning Code UpdateVillage of Northbrook$4,334.00 $0.00 $17,332.00 $21,666.00 Completed
2013Oak Forest Developer Discussion PanelDeveloper PanelCity of Oak Forest$3,750.00 $0.00 $0.00 $3,750.00 Completed
2013Pace Fox Valley StudyTransit Improvement PlanPace$80,000.00 $20,000.00 $0.00 $100,000.00 Completed
2013Park Forest Developer Discussion PanelDeveloper PanelVillage of Park Forest$3,750.00 $0.00 $0.00 $3,750.00 Completed
2013Richton Park Developer Discussion PanelDeveloper PanelVillage of Richton Park$3,750.00 $0.00 $0.00 $3,750.00 Completed
2013Ridgeland Avenue Corridor StudyCorridor PlanningCook County Department of Transportation and Highways$160,000.00 $40,000.00 $0.00 $200,000.00 Completed
2013River Grove Thatcher Avenue TODTransit-Oriented Development PlanVillage of River Grove$60,000.00 $15,000.00 $0.00 $75,000.00 Completed
2013University Park Developer Discussion PanelDeveloper PanelVillage of University Park$3,500.00 $0.00 $0.00 $3,500.00 Completed
2013Villa Park Developer Discussion PanelDeveloper PanelVillage of Villa Park$3,750.00 $0.00 $0.00 $3,750.00 Completed
2013Winthrop Harbor TOD Zoning Code UpdateTOD Zoning Code UpdateVillage of Winthrop Harbor$4,334.00 $0.00 $17,332.00 $21,666.00 Completed
2012Bensenville Developer Discussion PanelTransit-Oriented Development Plan, Transit Improvement PlanVillage of Bensenville$3,500.00 $0.00 $0.00 $3,500.00 Completed
2012Buffalo Grove TOD Zoning Code UpdateTOD Zoning Code UpdateVillage of Buffalo Grove$4,334.00 $0.00 $17,332.00 $21,666.00 Completed
2012Cicero Connections InitiativeTransit-Oriented Development Plan, Transit Improvement PlanTown of Cicero$118,503.20 $29,625.80 $0.00 $148,129.00 Completed
2012Evanston Main Street Station Transit-Oriented Development PlanTransit-Oriented Development PlanCity of Evanston$100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2012Fox Lake Station Area PlanTransit-Oriented Development PlanVillage of Fox Lake$80,000.00 $20,000.00 $0.00 $100,000.00 Completed
2012Franklin Park Developer Discussion PanelDeveloper PanelVillage of Franklin Park$3,500.00 $0.00 $0.00 $3,500.00 Completed
2012Kenilworth Corridor Transportation and Streetscape PlanTransit Improvement PlanVillage of Kenilworth$59,999.20 $14,999.80 $0.00 $74,999.00 Completed
2012La Grange Stone Avenue Station Access Improvement PlanPedestrian Access to TransitVillage of LaGrange$0.00 $0.00 $0.00 $0.00 Completed
2012Lake Villa Downtown TOD PlanTransit-Oriented Development PlanVillage of Lake Villa$99,872.00 $24,968.00 $0.00 $124,840.00 Completed
2012Manhattan Developer Discussion PanelDeveloper PanelVillage of Manhattan$3,500.00 $0.00 $0.00 $3,500.00 Completed
2012Maywood Developer Discussion PanelDeveloper PanelVillage of Maywood$3,500.00 $0.00 $0.00 $3,500.00 Completed
2012Midlothian Developer Discussion PanelDeveloper PanelVillage of Midlothian$3,500.00 $0.00 $0.00 $3,500.00 Completed
2012Mokena Developer Discussion PanelDeveloper PanelVillage of Mokena$3,500.00 $0.00 $0.00 $3,500.00 Completed
2012Mount Prospect Downtown Implementation PlanTransit-Oriented Development PlanVillage of Mount Prospect$78,876.00 $19,719.00 $0.00 $98,595.00 Completed
2012Robbins Pedestrian Access Improvement PlanPedestrian Access to TransitVillage of Robbins$11,856.60 $0.00 $47,426.40 $59,283.00 Completed
2012Villa Park TOD Zoning Code UpdateTOD Zoning Code UpdateVillage of Villa Park$4,334.00 $0.00 $17,332.00 $21,666.00 Completed
2012Village of Carpentersville Transit Improvement PlanTransit Improvement PlanVillage of Carpentersville$59,983.20 $14,995.80 $0.00 $74,979.00 Completed
2012Westmont TOD Zoning Code UpdateTransit-Oriented Development PlanVillage of Westmont$4,334.00 $0.00 $17,332.00 $21,666.00 Completed
2012Wilmette TOD Zoning Code Update (Parking)TOD Zoning Code UpdateVillage of Wilmette$2,000.00 $0.00 $8,000.00 $10,000.00 Completed
2012Wood Dale Developer Discussion PanelDeveloper PanelVillage of Wood Dale$3,500.00 $0.00 $0.00 $3,500.00 Completed
2011Blue Island TOD Zoning Code UpdateTOD Zoning Code UpdateCity of Blue Island$21,666.00 $0.00 $0.00 $21,666.00 Completed
2011Chicago Southland TOD Corridor Planning Study Phase II ImplementationTransit-Oriented Development PlanSouth Suburban Mayors and Managers Association (SSMMA)$100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2011Cicero Avenue Corridor PlanTransit-Oriented Development Plan, Transit Improvement PlanSouthwest Conference of Mayors$160,000.00 $40,000.00 $0.00 $200,000.00 Completed
2011Elgin Chicago Street Station Area PlanTransit-Oriented Development PlanCity of Elgin$80,000.00 $20,000.00 $0.00 $100,000.00 Completed
2011Hanover Park Village Center Transit-Oriented Development (TOD)Transit-Oriented Development PlanVillage of Hanover Park$80,000.00 $20,000.00 $0.00 $100,000.00 Completed
2011Hoffman Estates Flexible Transit Service OperationsTransit Improvement PlanVillage of Hoffman Estates$64,000.00 $16,000.00 $0.00 $80,000.00 Completed
2011Manhattan TOD Zoning Code UpdateTOD Zoning Code UpdateVillage of Manhattan$21,666.00 $0.00 $0.00 $21,666.00 Completed
2011McHenry County Services Restructuring StudyTransit Improvement PlanMcHenry County$119,996.80 $29,999.20 $0.00 $149,996.00 Completed
2011Naperville Metra Station Bus Depot and Commuter Access Feasibility StudyTransit Improvement PlanCity of Naperville$63,327.20 $15,831.80 $0.00 $79,159.00 Completed
2011Northbrook Downtown Station Area PlanTransit-Oriented Development PlanVillage of Northbrook$99,604.00 $24,901.00 $0.00 $124,505.00 Completed
2011Prairie Grove TOD Zoning Code UpdateTOD Zoning Code UpdateVillage of Prairie Grove$21,666.00 $0.00 $0.00 $21,666.00 Completed
2011Rolling Meadows Golf Road Transit and Pedestrian Mobility StudyTransit Improvement PlanCity of Rolling Meadows$71,008.00 $17,752.00 $0.00 $88,760.00 Completed
2011Romeoville East Side PlanTransit-Oriented Development Plan, Transit Improvement PlanVillage of Romeoville$79,960.00 $19,990.00 $0.00 $99,950.00 Completed
2010Chicago South Lakefront Corridor Transit StudyTransit Improvement PlanCity of Chicago$359,956.00 $89,989.00 $0.00 $449,945.00 Completed
2010Chicago Washington Park 63rd Street Corridor TOD StudyTransit-Oriented Development Plan, Transit Improvement PlanCity of Chicago$119,983.32 $29,995.83 $0.00 $149,979.15 Completed
2010Clarendon Hills Train Station Redevelopment Phase I ImplementationTransit-Oriented Development PlanVillage of Clarendon Hills$79,984.00 $19,996.00 $0.00 $99,980.00 Completed
2010Geneva Downtown / Station Area Master PlanTransit-Oriented Development PlanCity of Geneva$99,265.13 $24,816.28 $0.00 $124,081.41 Completed
2010Hanover Park - County Farm Road Transit Service StudyTransit Improvement PlanVillage of Hanover Park$120,000.00 $30,000.00 $0.00 $150,000.00 Completed
2010Lombard Downtown Implementation StudyTransit-Oriented Development PlanVillage of Lombard$100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2010Pace Transit Signal Priority Planning for the Milwaukee Avenue Arterial Rapid TransitTransit Improvement PlanPace$94,641.60 $23,660.40 $0.00 $118,302.00 Completed
2010Skokie-Dempster Station Area PlanTransit-Oriented Development PlanVillage of Skokie$99,768.20 $24,942.05 $0.00 $124,710.25 Completed
2010South Elgin Transit Improvement PlanTransit Improvement PlanVillage of South Elgin$60,000.00 $15,000.00 $0.00 $75,000.00 Completed
2009Antioch Downtown Land Use and Transit Implementation StrategyTransit-Oriented Development PlanVillage of Antioch$79,766.00 $19,942.00 $0.00 $99,708.00 Completed
2009Bensenville Transit Improvement Plan and Station Area StudyTransit-Oriented Development PlanVillage of Bensenville$98,504.00 $24,626.00 $0.00 $123,130.00 Completed
2009Chicago - Metra Milwaukee District West Line Transit-Friendly Development PlanTransit-Oriented Development PlanCity of Chicago$175,698.00 $43,924.00 $0.00 $219,622.00 Completed
2009Chicago Southland Transit RegionTransit-Oriented Development PlanSouth Suburban Mayors and Managers Association$140,000.00 $35,000.00 $0.00 $175,000.00 Completed
2009Des Plaines Cumberland Transit-Oriented Development PlanTransit-Oriented Development PlanCity of Des Plaines$83,550.34 $0.00 $41,151.66 $124,702.00 Completed
2009DuPage County Transit Plan UpdateTransit Improvement PlanDuPage County$50,000.00 $68,532.82 $0.00 $118,532.82 Completed
2009East Dundee: Dundee Crossing Transit CenterTransit-Oriented Development PlanVillage of East Dundee$79,816.00 $19,954.00 $0.00 $99,770.00 Completed
2009Glenwood Station Area StudyTransit-Oriented Development PlanVillage of Glenwood$73,400.00 $18,350.00 $0.00 $91,750.00 Completed
2009Joliet Intermodal Transportation Center Feasibility StudyTransit Improvement PlanCity of Joliet$100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2009Kane County LRP Transit ComponentTransit Improvement PlanKane County$80,000.00 $39,738.00 $0.00 $119,738.00 Completed
2009Manhattan Village CenterTransit-Oriented Development PlanVillage of Manhattan$100,000.00 $25,018.00 $0.00 $125,018.00 Completed
2009Pace Harlem Avenue Corridor PlanTransit-Oriented Development Plan, Transit Improvement PlanSouthwest Conference of Mayors$157,723.89 $39,430.97 $0.00 $197,154.86 Completed
2009Pace I-355 Express BusTransit Improvement PlanPace$212,787.20 $53,196.80 $0.00 $265,984.00 Completed
2009Prairie Grove Town Center and TOD Development PlanTransit-Oriented Development PlanVillage of Prairie Grove$94,734.00 $23,684.00 $0.00 $118,418.00 Completed
2009Schaumburg Transit Service AssessmentTransit Improvement PlanVillage of Schaumburg$80,000.00 $20,000.00 $0.00 $100,000.00 Completed
2009Southwest Will TMA StudyTransit Improvement PlanJoliet Arsenal Development Authority$100,000.00 $25,000.00 $0.00 $125,000.00 Completed
2009St. Charles Circulator Feasibility StudyTransit Improvement PlanCity of St. Charles$79,428.00 $19,857.00 $0.00 $99,285.00 Completed
2009Western Springs Downtown PlanTransit-Oriented Development PlanVillage of Western Springs$95,984.00 $23,996.00 $0.00 $119,980.00 Completed
2009Will County Coordinated Paratransit StudyTransit Improvement PlanWill County$79,996.00 $19,999.00 $0.00 $99,995.00 Completed
2009Wilmette Village Center Master PlanTransit-Oriented Development PlanVillage of Wilmette$99,302.40 $24,825.60 $0.00 $124,128.00 Completed
2007Addison Advantage Transit ImprovementsTransit Improvement PlanVillage of Addison$0.00 $20,000.00 $80,000.00 $100,000.00 Completed
2007Chicago Heights Station Area PlanTransit-Oriented Development PlanCity of Chicago Heights$0.00 $19,915.00 $79,660.00 $99,575.00 Completed
2007Chicago Transit-Friendly Development at CTA StationsTransit-Oriented Development PlanCity of Chicago$200,000.00 $50,000.00 $0.00 $250,000.00 Completed
2007Evanston Multi-Modal Master Transportation PlanTransit Improvement PlanCity of Evanston$0.00 $80,000.00 $20,000.00 $100,000.00 Completed
2007Greater Roseland (Chicago) Transit-Linked Community Development ProjectTransit Improvement PlanDeveloping Communities Project (DCP)$30,000.00 $0.00 $120,000.00 $150,000.00 Completed
2007Huntley Transit-Oriented Development GuidelinesTransit-Oriented Development PlanVillage of Huntley$0.00 $21,103.00 $84,410.00 $105,513.00 Completed
2007Kane County Randall Road Pace Route 529 PlanTransit-Oriented Development Plan, Transit Improvement PlanKane County$0.00 $25,000.00 $100,000.00 $125,000.00 Completed
2007Lake County Inter/Intra County Paratransit Transportation StudyTransit Improvement PlanLake County$0.00 $19,322.00 $77,289.00 $96,611.00 Completed
2007Lake Forest: Forest Green Transit StudyTransit Improvement PlanCity of Lake Forest$80,000.00 $20,000.00 $0.00 $100,000.00 Completed
2007Marengo Station Area PlanTransit-Oriented Development PlanCity of Marengo$0.00 $19,948.00 $79,792.00 $99,740.00 Completed
2007Mount Prospect Public Transportation System PlanTransit-Oriented Development Plan, Transit Improvement PlanVillage of Mount Prospect$0.00 $24,959.00 $99,836.00 $124,795.00 Completed
2007Plainfield STAR Line Transit-Oriented Development District PlanTransit-Oriented Development PlanVillage of Plainfield$0.00 $24,625.00 $98,498.00 $123,123.00 Completed
2007South Chicago Heights Station Area PlanTransit-Oriented Development PlanVillage of South Chicago Heights$0.00 $19,931.00 $79,724.00 $99,655.00 Completed
2006Berwyn Transit-Oriented Master PlanTransit-Oriented Development PlanCity of Berwyn$19,078.00 $0.00 $76,313.00 $95,391.00 Completed
2006Chicago--Reconnecting NeighborhoodsTransit-Oriented Development Plan, Transit Improvement PlanCity of Chicago$51,243.00 $53,446.00 $118,757.00 $223,446.00 Completed
2006Crete Downtown and Balmoral Park Station Area PlansTransit-Oriented Development PlanVillage of Crete$2,770.00 $20,000.00 $91,080.00 $113,850.00 Completed
2006Elgin National Street Station Area PlanTransit-Oriented Development PlanCity of Elgin$0.00 $20,000.00 $80,000.00 $100,000.00 Completed
2006Montgomery Park and Ride Facility PlanTransit-Oriented Development PlanVillage of Montgomery$80,000.00 $32,496.00 $0.00 $112,496.00 Completed
2006Pace Service Planning ToolTransit Improvement PlanPace$250,000.00 $802,570.00 $0.00 $1,052,570.00 Completed
2006South Suburban Commuter Rail Corridor Phase I & IITransit Improvement PlanSouth Suburban Mayors and Managers Association$76,811.00 $241,300.00 $0.00 $318,111.00 Completed
2006Winfield Town Center Revitalization PlanTransit-Oriented Development PlanVillage of Winfield$938.00 $20,000.00 $83,750.00 $104,688.00 Completed
2005Bellwood Transit Oriented-Development PlanTransit-Oriented Development PlanVillage of Bellwood$0.00 $20,771.00 $83,084.00 $103,855.00 Completed
2005Buffalo Grove Transit-Oriented Development PlanTransit-Oriented Development PlanVillage of Buffalo Grove$12,443.00 $12,443.00 $99,541.00 $124,427.00 Completed
2005Elmwood Park Station Area PlanTransit-Oriented Development PlanVillage of Elmwood Park$0.00 $19,023.00 $76,094.00 $95,117.00 Completed
2005Justice Transit Improvement StudyTransit Improvement PlanVillage of Justice$6,741.00 $6,741.00 $53,928.00 $67,410.00 Completed
2005Melrose Park Lake Street Transit Improvement PlanTransit Improvement PlanVillage of Melrose Park$0.00 $15,770.00 $63,080.00 $78,850.00 Completed
2005Mokena Transit-Oriented Development PlanTransit-Oriented Development PlanVillage of Mokena$4,900.00 $20,000.00 $99,600.00 $124,500.00 Completed
2005Naperville Circulator Implementation PlanTransit Improvement PlanCity of Naperville$65,634.00 $16,409.00 $0.00 $82,043.00 Completed
2005Orland Park LaGrange Road Transit Improvement PlanTransit Improvement PlanVillage of Orland Park$0.00 $19,971.00 $79,884.00 $99,855.00 Completed
2005Villa Park Station Area PlanTransit-Oriented Development PlanVillage of Villa Park$0.00 $15,577.00 $62,310.00 $77,887.00 Completed
2004DuPage Phase I Community CirculatorsTransit Improvement PlanDuPage Mayors & Managers$140,151.00 $30,000.00 $0.00 $170,151.00 Completed
2004Harvey Intermodal Station Area PlanTransit-Oriented Development PlanCity of Harvey$16,739.00 $0.00 $66,954.00 $83,693.00 Completed
2004Midlothian Station Area EnhancementTransit-Oriented Development PlanVillage of Midlothian$60,000.00 $0.00 $80,000.00 $140,000.00 Completed
2004Niles Bus Oriented-Development Plan for Milwaukee AvenueTransit-Oriented Development Plan, Transit Improvement PlanVillage of Niles$10,000.00 $10,000.00 $80,000.00 $100,000.00 Completed
2004Park Forest Metra Electric District 211th Street Station Area PlanTransit-Oriented Development PlanVillage of Park Forest$10,200.00 $9,800.00 $80,000.00 $100,000.00 Completed
2004Skokie and Evanston: Skokie Swift Corridor Travel Market AnalysisTransit Improvement PlanEvanston/Skokie$120,000.00 $30,000.00 $0.00 $150,000.00 Completed
2004Wood Dale Station Area PlanTransit-Oriented Development PlanVillage of Wood Dale$0.00 $18,340.00 $73,360.00 $91,700.00 Completed
2003Cook-DuPage Corridor StudyTransit Improvement PlanRTA$1,039,789.00 $0.00 $578,211.00 $1,618,000.00 Completed
2003La Grange Comprehensive Plan Update and BNSF Corridor PlanTransit-Oriented Development PlanVillage of LaGrange$0.00 $65,000.00 $60,000.00 $125,000.00 Completed
2003Mundelein Station Area PlanTransit-Oriented Development PlanVillage of Mundelein$0.00 $18,568.00 $60,000.00 $78,568.00 Completed
2003New Lenox Station Area PlanTransit-Oriented Development PlanVillage of New Lenox$0.00 $24,326.00 $97,303.00 $121,629.00 Completed
2003Oak Park Intermodal Station Area PlanTransit-Oriented Development PlanVillage of Oak Park$0.00 $181,518.00 $60,000.00 $241,518.00 Completed
2003Pace Market Feasibility Study for North Central Shuttle ServiceTransit Improvement PlanPace$15,083.00 $0.00 $60,334.00 $75,417.00 Completed
2003Riverside Central Business District Station Area PlanTransit-Oriented Development PlanVillage of Riverside$0.00 $15,000.00 $60,000.00 $75,000.00 Completed
2003Winthrop Harbor Station Area PlanTransit-Oriented Development PlanVillage of Winthrop Harbor$0.00 $14,440.00 $57,760.00 $72,200.00 Completed
2002Franklin Park West Line Station Area Planning StudyTransit-Oriented Development PlanVillage of Franklin Park$0.00 $15,000.00 $60,000.00 $75,000.00 Completed
2002Lemont Station Area Planning StudyTransit-Oriented Development PlanVillage of Lemont$0.00 $20,000.00 $80,000.00 $100,000.00 Completed
2002North Chicago Station Area Planning StudyTransit-Oriented Development PlanCity of North Chicago$0.00 $14,964.00 $59,856.00 $74,820.00 Completed
2002Richton Park Station Area Planning StudyTransit-Oriented Development PlanVillage of Richton Park$10,042.00 $7,500.00 $70,168.00 $87,710.00 Completed
2002Wheeling Station Area Planning StudyTransit-Oriented Development PlanVillage of Wheeling$0.00 $15,000.00 $60,000.00 $75,000.00 Completed
2001Fox River Grove Downtown Redevelopment PlanTransit-Oriented Development PlanVillage of Fox River Grove$0.00 $14,500.00 $58,000.00 $72,500.00 Completed
2001Lake County 2020 Transportation Plan: Transit ComponentTransit Improvement PlanLake County$0.00 $0.00 $0.00 $0.00 Completed
2001Maywood Station Area Planning StudyTransit-Oriented Development PlanVillage of Maywood$17,620.00 $0.00 $70,748.00 $88,368.00 Completed
2001Woodstock Transit-Oriented Development StudyTransit-Oriented Development PlanCity of Woodstock$0.00 $13,500.00 $54,000.00 $67,500.00 Completed
2000Hazel Crest 170th Street Station Transit-Oriented Development Planning StudyTransit-Oriented Development PlanVillage of Hazel Crest$11,000.00 $0.00 $44,000.00 $55,000.00 Completed
2000Inner and Outer Circumferential Rail Corridors Feasibility StudyTransit Improvement PlanMetra$30,755.00 $51,464.00 $106,502.00 $188,721.00 Completed
2000Joliet Arsenal Area Transportation PlanTransit Improvement PlanJoliet Arsenal Development Authority$20,000.00 $90,000.00 $80,000.00 $190,000.00 Completed
2000McHenry County Transportation Plan: Transit ComponentTransit Improvement PlanMcHenry County$0.00 $0.00 $0.00 $0.00 Completed
2000Morton Grove Commuter Station Location AnalysisTransit-Oriented Development PlanVillage of Morton Grove$50,000.00 $49,500.00 $0.00 $99,500.00 Completed
2000Riverdale 138th Street Station Planning StudyTransit-Oriented Development PlanVillage of Riverdale$9,700.00 $0.00 $38,800.00 $48,500.00 Completed
2000Robbins Metra Station Transit-Oriented Development StudyTransit-Oriented Development PlanVillage of Robbins$11,400.00 $0.00 $45,600.00 $57,000.00 Completed
2000Skokie Swift Station Location Feasibility StudyTransit Improvement PlanVillage of Skokie$39,912.00 $39,971.00 $80,000.00 $159,883.00 Completed
2000University Park Transit-Oriented Development Planning StudyTransit-Oriented Development PlanVillage of University Park$0.00 $14,987.00 $59,946.00 $74,933.00 Completed
1999Blue Island Transit-Oriented DevelopmentTransit-Oriented Development PlanCity of Blue Island$22,200.00 $0.00 $0.00 $22,200.00 Completed
1999DuPage Area Transit PlanTransit Improvement PlanDuPage Mayors and Managers Conference$150,778.00 $0.00 $126,467.00 $277,245.00 Completed
1999Elmhurst Downtown PlanTransit-Oriented Development PlanCity of Elmhurst$7,500.00 $0.00 $0.00 $7,500.00 Completed
1999Evanston Transportation Center Planning StudyTransit-Oriented Development PlanCity of Evanston$69,447.00 $29,763.00 $0.00 $99,210.00 Completed
1999Kane County Transit Opportunity AssessmentTransit Improvement PlanKane County$0.00 $16,736.00 $27,000.00 $43,736.00 Completed
1999Lake County Route 60 and Route 22 Corridor Shuttle StudyTransit Improvement PlanTMA of Lake Cook$45,000.00 $0.00 $0.00 $45,000.00 Completed
1999Olympia Fields Town Center Development PlanTransit-Oriented Development PlanVillage of Olympia Fields$37,949.00 $0.00 $0.00 $37,949.00 Completed
1999Orland Park Transit-Oriented Development Planning StudyTransit-Oriented Development PlanVillage of Orland Park$30,000.00 $20,000.00 $0.00 $50,000.00 Completed
1999Waukegan Intermodal Transit Facility StudyTransit-Oriented Development PlanCity of Waukegan$15,000.00 $40,000.00 $60,000.00 $115,000.00 Completed
1999Westmont Transit-Oriented Development Opportunity StudyTransit-Oriented Development PlanVillage of Westmont$20,000.00 $0.00 $20,000.00 $40,000.00 Completed
1998Northwest Corridor StudyTransit Improvement PlanNorthwest Municipal Conference$346,487.00 $298,974.00 $484,000.00 $1,129,461.00 Completed
1998Tinley Park Station Area PlansTransit-Oriented Development PlanVillage of Tinley Park$40,000.00 $0.00 $0.00 $40,000.00 Completed